No. Deliverable description Nature Tasks

Month due

D_NA2.1 Product web site set up Web site NA2.T1

Jun 07

D_NA2.2 Repository for source code of product set up Report NA2.T1

Jun 07

D_NA2.3 Demonstration of propagation of uncertainties in test configuration with observations from flask sampling site and the European sink as target quantity Report NA2.T2 Jul 08
D_NA2.4 Complete derivative code verified after integration of LMDz and comparison of impact calculations with LMDz and TM2 Report NA2.T3

Nov 08

D_NA2.5 Demonstration of he impact of an additional flux site on a set of target quantities Report NA2.T4

Sep 09

D_NA2.6 Presentation, demonstration, and distribution of the prototype for testing and feed_back to the IMECC consortium and the public Workshop NA2.T4

Mar 10

D_NA2.7 Final product, including manual, online description ready for users Report NA2.T4

Mar 11


NA3: Networking of Quality Control for Atmospheric measurements
Top
No. Deliverable description Nature Tasks

Month due

D_NA3.1 Establishment of reporting tool on web site Web site NA3.T1 NA3.T2 NA3.T3 NA3.T4 NA3.T5

Sep. 07

D_NA3.2 Establishment of experimental protocols for each task Report NA3.T1 NA3.T2 NA3.T3 NA3.T4

Sep. 07

D_NA3.3 Establishment of the four complementary quality control programmes Website NA3.T1 NA3.T2 NA3.T3 NA3.T4 Mar. 08
D_NA3.4 Monitoring of systematic differences between GASLABS Dataset Report NA3.T1 NA3.T2 NA3.T4

Mar. 09

D_NA3.5 Monitoring of systematic differences betwenn field stations Dataset Report NA3.T3

Mar. 10


NA4: Isotope Standard Reference Material
Top
No. Deliverable description Nature Tasks

Month due

D_NA4.1 Distribution of isotopically calibrated air samples Dataset NA4.T1

Sep 07

D_NA4.2 Protocol of SRM generation in ARAMIS Report NA4.T1

Sep 07

D_NA4.3 Report on users measurements of SRM isotopically calibrated air Report NA4.T2 Mar 10
D_NA4.4 Final report on performances and results of SRM preparation and sitribution Dataset Report NA4.T1 NA4.T2

Mar 11


NA5: Network of Algorithms and Software for flux measurements
Top
No. Deliverable description Nature Tasks

Month due

D_NA5.1 Distribution of all software used and publish on the web Website NA5.T1

Sep 07

 

D_NA5.2 Distribution of all raw data sets for software inter-comparison Dataset NA5.T1

Mar 08

D_NA5.3 Report on all algorithms used and strategy for comparison Report NA5.T2 Sep 08
D_NA5.4 Report on results of inter-comparison Dataset Report NA5.T1

Jul 09

D_NA5.5 Paper on quidelines for flux measurements Report NA5.T1

Mar 10

D_NA5.6 Intercomparison for flux measurements for ICOS Software NA5.T1 NA5.T2

Dec 10


NA6: Terrestrial Carbon Data Center (TCDC)
Top
No. Deliverable description Nature Tasks

Month due

D_NA6.1 Specification completed Website NA6.T1

Sep 07

D_NA6.2 First gap-filled, quality -control data available Report Protocol NA6.T4

Mar 08

D_NA6.3 TDC online Website NA6.T2 Jun 08
D_NA6.4 First version of data selection algorithms online Report NA6.T3

Sep 08

D_NA6.5 Routine provision of ecosystem data Website NA6.T4

Dec 08

D_NA6.6 Routine provision of concentration and meteorology data on TDC Website NA6.T5

Mar 09

D_NA6.7 Final versions of algorithms documented Report NA6.T2 NA6.T3

Mar 10

D_NA6.8 Final data archived and transferred to follow-up projects Website NA6.T1

Mar 11


JRA1: Real-Time transmission and processing of atmospheric CO2 data
Top
No. Deliverable description Nature Tasks

Month due

D_JRA1.1 Inventory of capabilities and requirements for real-time transmission Report JRA1.T1

Dec 07

D_JRA1.2

Specification of real-time data requirements for selection Report JRA1.T2

Mar 08

D_JRA1.3 Two demonstration sites equipped with real-time transmission Dataset JRA1.T1 Mar 08
D_JRA1.4 Two demonstration sites equipped with real-time transmission Dataset JRA1.T1 JRA1.T2

Mar 09

D_JRA1.5 Automated, complete, real-time processing chain Report JRA1.T1 JRA1.T2

Mar 10

D_JRA1.6 Final documentation for follow-on projects Report JRA1.T1 JRA1.T2

Dec 10


JRA2: Calibration of Remotely Sensed CO2
Top
No. Deliverable description Nature Tasks

Month due

D_JRA2.1 FTIR-spectrometer constructed and tested in manual mode Instrument JRA2.T1 JRA2.T2

Sep 08

 

D_JRA2.2 First automated measurements from Orleans Instrument JRA2.T1

Mar 09

D_JRA2.3 First comparison with low-level profile and tower data Report JRA2.T3 Sep 09
D_JRA2.4 First satellite comparison Dataset JRA2.T3

Sep 10

D_JRA2.5 Final data archive Dataset JRA1.T3

Mar 11


JRA3: Real-time Ecosystem and Flux Data
Top
No. Deliverable description Nature Tasks

Month due

D_JRA3.1 Inventory of current measurement and data delivery Report JRA3.T1 JRA3.T2

Sep 07

D_JRA3.2 3 sites data transmission operational Website JRA3.T1

Mar 08

D_JRA3.3

3 sites upgraded to full measurement suite

Instrument

JRA3.T2

Jun 08

D_JRA3.4 Automated transmission from all sites Website JRA3.T1

Mar 09

D_JRA3.5 All sites upgraded to full measurement suite Instrument JRA3.T2

Sep 09

D_JRA3.6 Final data archive and documentation for follow-on Report JRA3.T1 JRA3.T2

Mar 11