NA1: Management of IMECC
Top
No. Deliverable description Nature Tasks Month due
M_NA1.1 Kick-off Meeting in Paris Agenda NA1.T1

Apr 07

M_NA1.2 Project long term web site Website NA1.T2

Sep 07


NA2: Networking Design Tool
Top
No. Deliverable description Tasks

Month due

M_NA2.1 Product web site set up NA2.T1

Jun 07

M_NA2.2 Repository for source code of product set up NA2.T1

Jun 07

M_NA2.3 Derivative code verified NA2.T1 Dec 08
M_NA2.4 LMDz test transport prepared NA2.T3

Mar 08

M_NA2.5 Example for European uptake prepared NA2.T2

Jul 09


NA3: Networking of Quality Control for Atmospheric measurements
Top
No. Deliverable description Tasks

Month due

M_NA3.1 Shipping contract (not possible) NA3.T1

Jun 07

M_NA3.2 Establishment of reporting on web site NA3.T1 NA3.T2 NA3.T3 NA3.T4 NA3.T5

Sep 07

M_NA3.3 Establishment of experimental protocols for each task NA3.T1 NA3.T2 NA3.T3 NA3.T4

Sep 07

M_NA3.4 Establishment of the four complementary quality control programmes NA3.T1 NA3.T2 NA3.T3 NA3.T4 Mar 08
M_NA3.4 Pipeline to TDC estbalished NA3.T1 NA3.T2 NA3.T4

Mar 09


NA4: Isotope Standard Reference Material
Top
No. Deliverable description Tasks

Month due

M_NA4.1 Distribution of isotopically calibrated air samples NA4.T1

Sep 07

D_NA4.2 Protocol of SRM generation in ARAMIS NA4.T1

Sep 07

D_NA4.3 Users report measurements on local and standard scale NA4.T2 Mar 08
D_NA4.4 2nd suite of standards distributed NA4.T1

Sep 08


NA5: Network of Algorithms and Software for flux measurements
Top
No. Deliverable description Tasks

Month due

M_NA5.1 Repository and server set up NA5.T1 NA5.T2

Jun 07

M_NA5.2 Distribution of all software used and publish them on the web NA5.T1

Sep 07

M_NA5.3 Datasets chosen and gathered NA5.T1 NA5.T2 Dec 07
M_NA5.4 Distribution of all raw data sets for software intercomparison NA5.T1

Mar 08

M_NA5.5 Report on all algoritms used and strategy for comparison NA5.T1 NA5.T2

Sep 08


NA6: Terrestrial Carbon Data Center (TCDC)
Top
No. Deliverable description Tasks

Month due

M_NA6.1 Computing infrastructure established NA6.T1 NA6.T2

Aug 07

M_NA6.2 Data transfer specification completed NA6.T1

Sep 07

M_NA6.3 First gap-filled, quality-controlled data available NA6.T4 Mar 08
M_NA6.4 TDC online NA6.T1

Jun 08

M_NA6.5 First version of data selection algorithms online NA6.T3

Sep 08


JRA1: Real-Time transmission and processing of atmospheric CO2 data
Top
No. Deliverable description Tasks

Month due

M_JRA1.1 Questionnaire for site PI's JRA1.T1

Jul 07

M_JRA1.2

Inventory of capabilities and requirements for real-time transmission JRA1.T1

Dec 08

M_JRA1.3 Specification of real-time data requirements for selection JRA1.T1 Mar 08
M_JRA1.4 Two demonstration sites equipped with real-time transmission JRA1.T1

Mar 08

M_JRA1.5 Trajectory analysis installed at two sites JRA1.T2

Jan 10


JRA2: Calibration of Remotely Sensed CO2
Top
No. Deliverable description Tasks

Month due

M_JRA2.1 FTIR parts ordered JRA2.T1

Jul 07

M_JRA2.2 Site agreement for Orleans concluded JRA2.T1

Nov 07

M_JRA2.3 Integration of FTIR in container JRA2.T1 Mar 08
M_JRA2.4 FTIR-spectrometer constructed and tested in manual mode JRA2.T1 JRA2.T2

Sep. 08


JRA3: Real-time Ecosystem and Flux Data
Top
No. Deliverable description Tasks

Month due

M_JRA3.1 Questionnaire for current capabilities distributed JRA3.T1 JRA3.T2

Jun 07

M_JRA3.2 Inventory of current measurement and data delivery JRA3.T1 JRA3.T2

Sep 07

M_JRA3.3

2 sites data transmission operational

JRA3.T1

Mar 08

M_JRA3.4 2 sites upgraded to full measurement suite JRA3.T2

Jun 08

M_JRA3.5 Automated pipeline to TDC from 2 sites JRA3.T1 JRA3.T2

Sep 08